-
Ray-hans Precision Tools Pvt LtdWe have coperated with Kingrui since 2005, Kingrui's foundation. we once were a Tyco company, and now a Group company. Kingrui show their best support
-
DENSOKINGRUI a reassuring supplier. and Kingrui stands out among Chinese spare parts makers. I recommand their team to many of my friends.
-
KYOCERA CorporationKingrui is a rigor partner. they can always keep the qualiy and fast delivery. we once invited their team to visit out workshop. they learns fast.
OEM Electrical Connector Mold Parts With Mirror Polishing Processing
Place of Origin | Dongguan, China ( Mainland ) |
---|---|
Brand Name | Kingrui |
Certification | ISO9001:2008 |
Model Number | KR010 |
Minimum Order Quantity | 1 Pcs |
Price | Negotiable |
Packaging Details | Anti-Rust Oil, PE film covered first, Plastic box, then carton |
Delivery Time | Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing. |
Payment Terms | T/T 50% as deposit 50% before shipment |
Supply Ability | 1200-1500 units per month |
Part Name | OEM Electrical Connector Mold Parts With Mirror Polishing Processing | Material Used | HSS/Stainless Steel/Prehard Steel/Tool Steel, Etc. |
---|---|---|---|
Machining Process | Grinding, EDM, Etc. | Application | Plastic Connectoe Molding Industry |
Grinding Tolerance | +/-0.02mm | EDM Tolerance | +/-0.005mm |
High Light | mold spare parts,precision automotive parts |
OEM Electrical Connector Mold Parts With Mirror Polishing Processing
Product Details
Product name | Custom - Made Connector Steel Mold Parts With Surface Grinding Processing |
Precision machine | Milling , Grinding, Wire cutting, EDM, etc. |
Applied software | Auto CAD,UG, CAD, etc. |
Material | PD613/H13/BH13/1.2344, etc. |
Surface finish | Polishing; Zinc/ nickel/chrome/gold plating, Sand blasting&etc. |
Dimension | As per customer's request. |
Tolerence Precision | +/-0.002-0.02mm/ can also be customized |
Lead time | Base on the quantity of order( usually 7days) |
Quality system | 100% inspection before shipping |
Packing | *PE film covered first, Plastic box, then carbon last. |
*As customer's specific requirements | |
Shipping | By sea, By air, By DHL, UPS, FEDEX&etc. |
Near Port | Shen zhen and Hangzhou |
Production Capabability
Main Machining Equipments
Main Measuring Equipments:
|
Our Services
A: The Japanese materials in our company are purchased from Japan’s first level agent in China. Swedish materials are purchased from China ASSAS and Germany materials are purchased from Shanghai Xinchang with material certificate provided by the first level agent in shipment. Our company believes in the management philosophy of“integrity first
B: The delivery cycle is generally 5~15 working days mainly according to the quantity and the degree of drawing. If it is particularly urgent for you, we arrange urgent order and try to solve problems .for you during the shortest lead time. We would usually use DHL for international in delivery. The clients can usually get the goods at the third day after shipment. If there occurs damage or missing, we will be responsible. In fact, DHL’s service is the best and we basically do not need to worry about it.
C: Please rest assured that all our products are QC inspected and accepted with inspection report before delivery and generally there will no non-conformance; in case of non-conformance, we will have them reworked or repaired at the first time
Our advantage
1. Various types of products;
Procuce fittings with different shapes, material quality, size and tolerances to meet customers' requirements.
2. High-quality and safe product
Give much credit by our customers,Kingrui has provided high-quality products to approximately 500 manufacturing industries world wide.
3.Prompt production and delivery
Regarding the urgent orders, we can finish 3 days.
4. Global Sales System
The products of Kingrui were popular and famous in Japan, USA, Europe and other regions.