• Dongguan Kingrui Precision Mould Co.,LTD
    Ray-hans Precision Tools Pvt Ltd
    We have coperated with Kingrui since 2005, Kingrui's foundation. we once were a Tyco company, and now a Group company. Kingrui show their best support
  • Dongguan Kingrui Precision Mould Co.,LTD
    DENSO
    KINGRUI a reassuring supplier. and Kingrui stands out among Chinese spare parts makers. I recommand their team to many of my friends.
  • Dongguan Kingrui Precision Mould Co.,LTD
    KYOCERA Corporation
    Kingrui is a rigor partner. they can always keep the qualiy and fast delivery. we once invited their team to visit out workshop. they learns fast.
Contact Person : Lydia
Phone Number : 13829100895
WhatsApp : +8613829100885

Wire - EDM SKD11 CNC Machined Components WIth Material Certification

Place of Origin Dongguan, China( Mainland)
Brand Name Kingrui
Certification ISO9001: 2008
Model Number KR005
Minimum Order Quantity 1 Pcs
Price Negotiable
Packaging Details PE film covered first, Plastic box, then carton last.
Delivery Time Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing.
Payment Terms T/T 50% as deposit 50% before shipment
Supply Ability 1200-1500 units per month
Product Details
Comcoment Name Precision Wire - EDM SKD11 CNC Machined Components WIth Material Certification Comcoment Material SKD11 From Japan Or OEM As Customer Requirement
Material Brand HTTACHI Accuracy Of Grinding 0.001 Mm
Accuracy Of EDM 0.002 Mm Drawing Format You Supply Can Be Accepted
High Light

machined metal parts

,

cnc machine parts

Leave a Message
Product Description

 
Precision Wire - EDM SKD11 CNC Machined Components WIth Material Certification
 
 
Introiduction of CNC machined component 

 

1. Material: SKD11, it is a kind of high carbon high chromium alloy tool steel after heat treatment has very high hardness and abrasion resistance, with hardenability, good stability and size, suitable for making cold mold with high precision long life and plastic mold of molding thermosetting.

 

2. Machining: This one CNC machined component, which is on display now, is finished by three processes, Namely, surface grinding, wire EDM, and precision EDM.

 

3. Machined Equipements: Japan Sodick supper- mirror and electro-discharge machine, surface- grinding machine, wire- EDM.

 

4. Surface finish: polishing, mirror polishing, DLC coating, PVD coating and more.

 

5. Applied software: Pro/E, Auto CAD 2000,solid work 2001,CAXA,UG,CAD,CAM

 

6. Product weight: 0.02kg to 100kg or according to your drawings.

 


Specification of CNC Machined Components

 

Equipments
  • CNC milling machines
  • Surface grinding machines 
  • Wire- EDM machines
  • Electric discharge machining machines
  • Punch forming machines and so no
Precision Processing CNC turning, milling, grinding, wire EDM cutting,EDM, etc.
Material

Brass, Aluminum, Steel, High-speed Steel, Copper and iron etc.

 

Surface Finish

Polishing

Mirror polishing

PVD coating

DLC coating

more...

Dimension

According to 2d/ 3d drawing or sample

 

Tolerance

+/- 0.001-- 0.005 mm

 

Color

Customer specified

 

Lead Time

* 5-15 working days for CNC machined component

 

Packing

* Eco- friendly  PE film / plastic bag/ strong Carton boxes or standard export wooden case

* Customer appointed

 

 

Shipping

 

* By sea / air / economic express. e.g DHL/ UPS/ TNT/ Others

* Customer appointed

Terms of Payment

Main term is TT 

 

 

 

Delivery


1, We have cooperation with China Post, DHL, UPS, FEDEX, EMS and so on, we may give you some advice of transportation.
China Post: For the package under 2kgs, Usually need 25-35days to get the package.
SHL, UPS, Fedex IE: For the package over 2kgs. If the package is under 20kgs, Shipping cost will be little high, For the package is over 20kgs, these express will be more economic.
Usually need 5-9days for the packages can be arrived. Tracking number can be offered after the package be sent out(for some country and area, It has remotes and contacted with us to check your area to check, for the remotes will cost remotes fee)
EMS: Most safety shipping way, Usually need 7-10 days to get the package.
Fedex IP: Most fast shipping way, Usually need 2-5 days to get the package, Especially for USA customers. Just 2-3 days to get the package. But cost little high.


2, If the order is big, we usually suggest you to use Air Freight, please inform us the nearest airport or port, we can help you check the best cost before shipment.


3, During or near to the Holidays and Festival, as so many packages be stucked at the customs, some packages will be delayed for few days, please kindly understand this.


4, All of the balance need to be paid before the shipment or bill of leding.